앞선 기술력과 철저한 제품 관리로 글로벌 최일류 기업으로 선도해 나갑니다.
Project IGSDK, Bag Filter System
Scop IDesign, Fabrication, Construction
Period I2016. 6
Specification I165ton, 11,200W x 19,200H x 19,200L
Project IGSDK, Bag Filter System
Scop IDesign, Fabrication, Construction
Period I2016. 6
Specification I165ton, 11,200W x 19,200H x 19,200L
Project IPOSCO 2 FINEX, Ore Dryer 168 Tower Dust
Collecting System
Scop IDesign, Fabrication, Installation
Period I2012. 7.31
Specification IBag, 520 m3/min, Bag, 380 m3/min
Project IPOSCO(Pohang) #1,2 Coal Plant
Scop IDesign, Fabrication, Installation
Period I2012. 3.20
Specification I510CMM , 340CMM , 620CMM , 420CMM
전남 순천시 해룡면 율촌산단3로 28(주)달성 T.061-729-9600 F.0505-300-9600
COPYRIGHTⓒDALSUNG.ALL RIGHTS RESERVED